Multicriteria time window-constrained project scheduling with applications to airport gate assignment. Part I: Methodology

This paper addresses the airport flight gate assignment problem with multiple objectives. The objectives are to maximize the total flight gate preferences, to minimize the number of towing activities and to minimize the absolute deviation of the new gate assignment from a so-called reference schedule. The problem examined is a multicriteria multi-mode resource-constrained project scheduling problem with generalized precedence constraints or time windows. While in previous approaches the problem has been simplified to a single objective counterpart, we tackle it directly by a multicriteria metaheuristic, namely Pareto Simulated Annealing, in order to get a representative approximation of the Pareto front.

Sprache
Englisch

Erschienen in
Series: Manuskripte aus den Instituten für Betriebswirtschaftslehre der Universität Kiel ; No. 595

Klassifikation
Management
Thema
airport gate assignment
multiple criteria optimization
project scheduling
time windows
Pareto simulated annealing
Flughafen
Scheduling-Verfahren
Multikriterielle Entscheidungsanalyse
Terminplanung
Projektmanagement
Theorie

Ereignis
Geistige Schöpfung
(wer)
Drexl, Andreas
Nikulin, Yuri
Ereignis
Veröffentlichung
(wer)
Universität Kiel, Institut für Betriebswirtschaftslehre
ZBW – Leibniz Information Centre for Economics
(wo)
Kiel
(wann)
2005

Handle
Letzte Aktualisierung
10.03.2025, 11:43 MEZ

Datenpartner

Dieses Objekt wird bereitgestellt von:
ZBW - Deutsche Zentralbibliothek für Wirtschaftswissenschaften - Leibniz-Informationszentrum Wirtschaft. Bei Fragen zum Objekt wenden Sie sich bitte an den Datenpartner.

Objekttyp

  • Arbeitspapier

Beteiligte

  • Drexl, Andreas
  • Nikulin, Yuri
  • Universität Kiel, Institut für Betriebswirtschaftslehre
  • ZBW – Leibniz Information Centre for Economics

Entstanden

  • 2005

Ähnliche Objekte (12)