Artikel

Comparison of heuristics for an economic lot scheduling problem with deliberated coproduction

We built on the Economic Lot Scheduling Problem Scheduling (ELSP) literature by making some modifications in order to introduce new constraints which had not been thoroughly studied with a view to simulating specific real situations. Specifically, our aim is to propose and simulate different scheduling policies for a new ELSP variant: Deliberated Coproduction. This problem comprises a product system in an ELSP environment in which we may choose if more than one product can be produced on the machine at a given time. We expressly consider the option of coproducing two products whose demand is not substitutable. In order to draw conclusions, a simulation model and its results were developed in the article by employing modified Bomberger data which include two items that could be produced simultaneously.

Sprache
Englisch

Erschienen in
Journal: Journal of Industrial Engineering and Management (JIEM) ; ISSN: 2013-0953 ; Volume: 2 ; Year: 2009 ; Issue: 3 ; Pages: 437-463 ; Barcelona: OmniaScience

Klassifikation
Management
Thema
ELSP
coproduction
simulation
heuristics

Ereignis
Geistige Schöpfung
(wer)
Vidal-Carreras, Pilar I.
Garcia-Sabater, Jose P.
Ereignis
Veröffentlichung
(wer)
OmniaScience
(wo)
Barcelona
(wann)
2009

DOI
doi:10.3926/jiem.v2n3.p437-463
Handle
Letzte Aktualisierung
10.03.2025, 11:41 MEZ

Datenpartner

Dieses Objekt wird bereitgestellt von:
ZBW - Deutsche Zentralbibliothek für Wirtschaftswissenschaften - Leibniz-Informationszentrum Wirtschaft. Bei Fragen zum Objekt wenden Sie sich bitte an den Datenpartner.

Objekttyp

  • Artikel

Beteiligte

  • Vidal-Carreras, Pilar I.
  • Garcia-Sabater, Jose P.
  • OmniaScience

Entstanden

  • 2009

Ähnliche Objekte (12)