Arbeitspapier

Econometric analysis of productivity with measurement error: Empirical application to the US Railroad industry

This paper analyzes the productivity in the US rail industry for the period 1980 - 2006. I propose a value-added production framework to circumvent the problem of measurement error in one input. I find evidence showing that aggregate productivity gains can be attributed to returns to scale and the reshuffling of resources to more efficient firms. However, productivity slows down for the period 1995 - 2000 after important concentrations. I also look at the correlations between firm-level productivity and the operating environment. My results show that failing to control for the omitted price variable bias leads to an overestimation of productivity gains.

ISBN
978-3-86304-094-9
Sprache
Englisch

Erschienen in
Series: DICE Discussion Paper ; No. 95

Klassifikation
Wirtschaft
Single Equation Models; Single Variables: Truncated and Censored Models; Switching Regression Models; Threshold Regression Models
Production, Pricing, and Market Structure; Size Distribution of Firms
Regulation and Industrial Policy: General
Railroads and Other Surface Transportation
Industry Studies: Utilities and Transportation: Government Policy
Thema
industry dynamics
measurement error
productivity
selection
simultaneity
railroad industry

Ereignis
Geistige Schöpfung
(wer)
Coublucq, Daniel
Ereignis
Veröffentlichung
(wer)
Heinrich Heine University Düsseldorf, Düsseldorf Institute for Competition Economics (DICE)
(wo)
Düsseldorf
(wann)
2013

Handle
Letzte Aktualisierung
10.03.2025, 11:44 MEZ

Datenpartner

Dieses Objekt wird bereitgestellt von:
ZBW - Deutsche Zentralbibliothek für Wirtschaftswissenschaften - Leibniz-Informationszentrum Wirtschaft. Bei Fragen zum Objekt wenden Sie sich bitte an den Datenpartner.

Objekttyp

  • Arbeitspapier

Beteiligte

  • Coublucq, Daniel
  • Heinrich Heine University Düsseldorf, Düsseldorf Institute for Competition Economics (DICE)

Entstanden

  • 2013

Ähnliche Objekte (12)