Controlling Sedimentation through Regulating the River by Thalpitigala Reservoir Project

Abstract 3  km- 2) and sediment transportation making rapid loosing of the capacity (5.13 MCM in 15 years) of the proposed reservoir. Thus, upper catchment protection with reforestation to reduce erosion, introduction of check dams in the upstream flow to trap the transported sediment and introduction of proper removal measures of deposited sediment are discussed for the proposed reservoir project.

Standort
Deutsche Nationalbibliothek Frankfurt am Main
Umfang
Online-Ressource
Sprache
Englisch

Erschienen in
Controlling Sedimentation through Regulating the River by Thalpitigala Reservoir Project ; volume:386 ; year:2024 ; pages:1-6 ; extent:6
Proceedings of the International Association of Hydrological Sciences / International Association of Hydrological Sciences ; 386 (2024), 1-6 (gesamt 6)

Urheber
Babarande Guruge, Thanura Lasantha
Palugaswewa, Bandara
Egashira, Shinji

DOI
10.5194/piahs-386-1-2024
URN
urn:nbn:de:101:1-2404250439091.523503732915
Rechteinformation
Open Access; Der Zugriff auf das Objekt ist unbeschränkt möglich.
Letzte Aktualisierung
14.08.2025, 10:45 MESZ

Datenpartner

Dieses Objekt wird bereitgestellt von:
Deutsche Nationalbibliothek. Bei Fragen zum Objekt wenden Sie sich bitte an den Datenpartner.

Beteiligte

  • Babarande Guruge, Thanura Lasantha
  • Palugaswewa, Bandara
  • Egashira, Shinji

Ähnliche Objekte (12)