Material Requirements Planning under Phase-out Conditions
In today's production environment with shortened product lifecycles, phase-outs, i.e. product elimination from production, become regular events. Badly planned phase-outs lead to high remaining stock levels after end of production, causing immense sunk costs. Previously performed 26 interviews revealed that this is a major challenge in current production (Grussenmeyer and Blecker, 2014; Grussenmeyer, Gencay and Blecker, 2014). Therefore, the objective of this paper is to develop a material requirements planning focusing on remaining stock induced costs during phase-out to plan optimal phase-out quantity and phase-out date. The research is conceptually driven and proposes an example of the methodology.
- Sprache
-
Englisch
- Erschienen in
-
10419/209191
- Klassifikation
-
Management
- Thema
-
Phase-Out
Product Elimination
Production Planning and Control
Remaining Stock Costs
- Ereignis
-
Geistige Schöpfung
- (wer)
-
Wagner, Regina
Blecker, Thorsten
- Ereignis
-
Veröffentlichung
- (wer)
-
epubli GmbH
- (wo)
-
Berlin
- (wann)
-
2015
- Handle
- Letzte Aktualisierung
-
10.03.2025, 11:41 MEZ
Datenpartner
ZBW - Deutsche Zentralbibliothek für Wirtschaftswissenschaften - Leibniz-Informationszentrum Wirtschaft. Bei Fragen zum Objekt wenden Sie sich bitte an den Datenpartner.
Objekttyp
- Konferenzbeitrag
Beteiligte
- Wagner, Regina
- Blecker, Thorsten
- epubli GmbH
Entstanden
- 2015