Artikel

Cost-saving erection of large heat storage tanks. A newly developed overground hot water storage tank using segmental construction on the test rig.

Scientists are testing a large overground hot water storage tank with lower production costs than comparable constructions thanks to its construction with prefabricated steel segments. The OBSERW research project is building on the experience gained from a large cool water storage tank that has been tried and tested in the district cooling network of the city of Chemnitz for more than ten years. For the first time, the construction principle, which is flexible in shape and size, could be transferred to hot water storage tanks that have to withstand high temperatures and temperature changes.
German Edition: Große Wärmespeicher kostensparend errichten. Ein neu entwickelter oberirdischer Warmwasserspeicher in Segmentbauweise auf dem Prüfstand.

Cost-saving erection of large heat storage tanks. A newly developed
            overground hot water storage tank using segmental construction on the test
            rig.

Cost-saving erection of large heat storage tanks. A newly developed overground hot water storage tank using segmental construction on the test rig. | Urheber*in: Meyer, Franz

In copyright

0
/
0

ISSN
0937-8367
Extent
4 p.
Language
Englisch

Bibliographic citation
BINE Informationsdienst - Projektinfo; 10/2018

Subject
Detailed information on energy research
Energy systems

Event
Geistige Schöpfung
(who)
Meyer, Franz
Event
Veröffentlichung
(when)
2018

Sponsorship
Förderung durch das Bundesministerium für Wirtschaft und Energie (BMWi)Förderkennzeichen: 03ET1230A-C
Last update
10.03.2025, 8:00 AM CET

Data provider

This object is provided by:
BINE Informationsdienst. If you have any questions about the object, please contact the data provider.

Object type

  • Artikel

Time of origin

  • 2018

Other Objects (12)