Artikel

Swift construction of pipelines. Method developed for the environmentally friendly installation of pipelines longer than one kilometre in length.

The laying of pipes, for example for heating networks, has previously been a labour intensive and time consuming occupation. With the newly developed “Pipe Express” method, a special tunnel boring machine drills through the ground at speeds of up to 1.2 metres per minute and conveys the soil directly to the surface instead of displacing it sideways. At the same time, the steel or concrete pipe is inserted into the horizontal borehole. In comparison with the open cut method, the process requires less than a fifth of the normal trench width and can also be used without lowering the groundwater level.

0
/
0

ISSN
0937-8367
Extent
4 p.
Language
Englisch

Bibliographic citation
BINE Informationsdienst - Projektinfo; 4/2014

Subject
Detailed information on energy research
Buildings & City: City & Region
Renewable energy sources: Geothermal energy

Event
Veröffentlichung
(when)
2014

Sponsorship
Förderung durch das Bundesministerium für Umwelt, Naturschutz und Reaktorsicherheit (BMU). Förderkennzeichen: 0325076. German Edition: Expressbau für Pipelines. Verfahren für die umweltschonende Verlegung von mehr als einem Kilometer langen Rohrleitungen entwickelt.
Last update
07.03.2025, 12:05 PM CET

Data provider

This object is provided by:
BINE Informationsdienst. If you have any questions about the object, please contact the data provider.

Object type

  • Artikel

Time of origin

  • 2014

Other Objects (12)