A three-stage assembly flow shop scheduling problem with blocking and sequence-dependent set up times

This paper considers a three-stage assembly flowshop scheduling problem with sequence-dependent setup times at the first stage and blocking times between each stage in such a way that the weighted mean completion time and makespan are minimized. Obtaining an optimal solution for this type of complex, large-sized problem in reasonable computational time using traditional approaches or optimization tools is extremely difficult. Thus, this paper proposes a meta-heuristic method based on simulated annealing (SA) in order to solve the given problem. Finally, the computational results are shown and compared in order to show the efficiency of our proposed SA.

Sprache
Englisch

Erschienen in
Journal: Journal of Industrial Engineering International ; ISSN: 2251-712X ; Volume: 8 ; Year: 2012 ; Pages: 1-7 ; Heidelberg: Springer

Klassifikation
Management
Thema
assembly flowshop scheduling
sequence-dependent setup times
blocking times
weighted mean completion time
makespan
Simulated annealing

Ereignis
Geistige Schöpfung
(wer)
Maleki-Darounkolaei, Aref
Modiri, Mahmoud
Tavakkoli-Moghaddam, Reza
Seyyedi, Iman
Ereignis
Veröffentlichung
(wer)
Springer
(wo)
Heidelberg
(wann)
2012

DOI
doi:10.1186/2251-712X-8-26
Handle
Letzte Aktualisierung
10.03.2025, 11:42 MEZ

Datenpartner

Dieses Objekt wird bereitgestellt von:
ZBW - Deutsche Zentralbibliothek für Wirtschaftswissenschaften - Leibniz-Informationszentrum Wirtschaft. Bei Fragen zum Objekt wenden Sie sich bitte an den Datenpartner.

Objekttyp

  • Artikel

Beteiligte

  • Maleki-Darounkolaei, Aref
  • Modiri, Mahmoud
  • Tavakkoli-Moghaddam, Reza
  • Seyyedi, Iman
  • Springer

Entstanden

  • 2012

Ähnliche Objekte (12)