Intermittent Operations of District Heating Networks in Summer Months : A Showcase

Abstract: In the OREWA project, optimization measures for existing heat networks were identified and assessed based on both economic and ecological considerations [1]. One of the focal investigations was the simulation of intermittent operational strategies tailored for the summer months. Next to the classic intermittent approach an innovative variation was explored, which involved the storage of hot water during intermediate phases in large central tanks to further minimize heat losses. Both the classic and innovative intermittent strategies showcased substantial reductions in network losses and energy consumption for circulation pumps. This research shows the melioration of heat network efficiency through a substantial reduction of summer heat losses for a network with a low heat demand density of 0.7 MWh/(m²·a). https://www.tib-op.org/ojs/index.php/isec/article/view/1209

Standort
Deutsche Nationalbibliothek Frankfurt am Main
Umfang
Online-Ressource
Sprache
Englisch

Erschienen in
Intermittent Operations of District Heating Networks in Summer Months ; volume:1 ; year:2024
International Sustainable Energy Conference proceedings ; 1 (2024)

Urheber
Vannahme, Anna
Müller, Simon
Schmitt, David
Summ, Thorsten
Trinkl, Christoph
Schrag, Tobias

DOI
10.52825/isec.v1i.1209
URN
urn:nbn:de:101:1-2406241129121.302356110163
Rechteinformation
Open Access; Der Zugriff auf das Objekt ist unbeschränkt möglich.
Letzte Aktualisierung
14.08.2025, 10:46 MESZ

Datenpartner

Dieses Objekt wird bereitgestellt von:
Deutsche Nationalbibliothek. Bei Fragen zum Objekt wenden Sie sich bitte an den Datenpartner.

Beteiligte

  • Vannahme, Anna
  • Müller, Simon
  • Schmitt, David
  • Summ, Thorsten
  • Trinkl, Christoph
  • Schrag, Tobias

Ähnliche Objekte (12)