Artikel
Resource leveling scheduling by an ant colony-based model
In project scheduling, many problems can arise when resource fluctuations are beyond acceptable limits. To overcome this, mathematical techniques have been developed for leveling resources. However, these produce a hard and inflexible approach in scheduling projects. The authors propose a simple resource leveling approach that can be used in scheduling projects with multi-mode execution activities. In the mentioned approach, an ant algorithm determines the execution mode of each activity so that resource leveling index and project time become optimum. In the model, some visibility functions (defined in accordance with problem characteristics) are utilized, and the best, which return the best result, is selected for the model.
- Sprache
-
Englisch
- Erschienen in
-
Journal: Journal of Industrial Engineering International ; ISSN: 2251-712X ; Volume: 8 ; Year: 2012 ; Pages: 1-9 ; Heidelberg: Springer
- Klassifikation
-
Management
- Thema
-
ant colony optimization
resource leveling
visibility function
- Ereignis
-
Geistige Schöpfung
- (wer)
-
Garmsiri, Mohsen
Abassi, Mohammad
- Ereignis
-
Veröffentlichung
- (wer)
-
Springer
- (wo)
-
Heidelberg
- (wann)
-
2012
- DOI
-
doi:10.1186/2251-712X-8-7
- Handle
- Letzte Aktualisierung
-
10.03.2025, 11:41 MEZ
Datenpartner
ZBW - Deutsche Zentralbibliothek für Wirtschaftswissenschaften - Leibniz-Informationszentrum Wirtschaft. Bei Fragen zum Objekt wenden Sie sich bitte an den Datenpartner.
Objekttyp
- Artikel
Beteiligte
- Garmsiri, Mohsen
- Abassi, Mohammad
- Springer
Entstanden
- 2012